ūrjamedhaENERGY INTELLIGENCE
SECURE PROJECT WORKSPACE

Sign in to BESS Navigator

Use your organization account to access saved project scenarios.

Password hashes and secure session cookies protect your account. Set up the first administrator with the one-time Cloudflare bootstrap secret.

ūrjamedhaBESS NAVIGATOR
STORAGE PROJECT INTELLIGENCEOverview
No scenario selected
Account
URJAMEDHA BESS NAVIGATOR

One asset.
Many value streams.

Compare grid services, revenue stacking, bankability and augmentation paths in one project workspace.

Create a project scenario, tune assumptions, then export a populated analysis workbook.

01   ARBITRAGE02   GRID SERVICES03   RENEWABLES04   AUGMENTATION
BESS CASE ANALYSIS

Build a case. Compare the stack.

Select a service to enter its commercial and operating inputs. Completed cases appear together in the comparison and charts.

Save each tuning as a scenario
Download input checklist ↓
Project assumptions not loaded. Choose “Load illustrative demo” to explore the charts, or enter your validated project inputs. Demo values are synthetic examples, not market quotes or a project forecast.
01

Battery & project assumptions

Shared across every service case.

02

Service case

Inputs are saved per case as you switch between them.

03

Augmentation strategy

Model a top-up as a new capacity cohort that degrades from its installation year.

The model estimates one augmentation event. Cost, outage, chemistry, warranty, augmentation design and capacity-retention curves must come from project and OEM evidence.

Screening boundaryAnnualized case economics; no interval co-optimization, taxes, financing, grid constraints, contract qualification or guaranteed payment. Case rates are analyst inputs. The PDF's India rule references and thresholds are shown as editable review bands in the operations tool and need verification against current applicable rules.
PROJECT FINANCE / SCREENING MODEL

Build the bankability case.

Bring CAPEX, revenue, operating risk, augmentation and debt assumptions together. Compare base and downside cash flows, DSCR and lifecycle cost in one editable model.

Access-controlled project data
Open use-case model ↑
Workbook integration: the India and US/EU files provide the model structure. Their example figures are not adopted as project facts. Enter current project, tariff, OEM, contract, tax and lender data; key bankability drivers are explicit, editable assumptions here.
01

Region, project & CAPEX

Set the project basis and choose a CAPEX build-up.

Financial amounts are entered in millions of the selected currency. For INR, ₹1 crore = ₹10 million.

02

Revenue stack

Model annual arbitrage and contract revenue, or bring in a completed service case.

Revenue components use entered prices and contract rates; there is no market-price forecast in this screening model.
03

Availability, cost & payment risk

Separate asset availability from grid curtailment and payment delay.

04

Augmentation & financing

Estimate one augmentation cohort and a level-payment debt schedule.

Debt service is modeled on initial project CAPEX. Augmentation is funded from project cash flow. Tax depreciation, loss carryforward, refinancing, sculpted debt and local tax rules are simplified; enter lender and advisor assumptions for screening.

05

Downside case

Stress key project drivers without implying a probability of occurrence.

Downside is a deterministic sensitivity: a revenue haircut plus a CAPEX overrun. It is not a P90 or Monte Carlo result.

Bankability screening boundaryThis is a transparent desktop screening model, not a lender-approved financial model, investment recommendation, tax opinion, credit decision, or probability forecast. It simplifies taxes, debt sculpting, replacement, insurance, market dispatch, settlement, degradation and working capital. Validate model outputs independently before commercial or financing decisions.
OPERATING EVIDENCE

Read service performance from intervals.

Load a local CSV to review frequency response, voltage support, peak reduction, renewable capture, availability and black-start records.

CSV stays on this device
04

Meter & reference setup

PDF values are reference bands only. Confirm the active operator requirements for the site.

Download signal template ↓
Reference from supplied “Day 9” document: frequency deadband 49.90–50.05 Hz, voltage review band 0.95–1.05 p.u., power-factor example of 0.95 leading/lagging, and one-second-or-finer frequency monitoring. These are editable references; confirm current site-specific requirements before review.
No operating file loaded.
SIGNAL TRACE / INTERVAL DATA

Inspect the selected signal.

Choose a CSV with operating signals to draw a trace.
PROJECT WORKSPACE

Scenario library

Save separate assumptions for a project, compare tuning options and return to them later. Operating interval CSV files stay on your device and are not uploaded with a scenario.

Your saved scenarios
Sign in to load your saved scenarios.
SCENARIO LIBRARY

Save scenario as

Give this set of assumptions a clear project name.